---
title: "Sample proposal: Lattice Data for Orchard & Pine (Sidebar layout)"
description: "A software rollout with a shadow-mode pilot and the success criteria agreed on the call. A fictional sample rendered live by proposal.here."
type: sample_proposal
fictional: true
url: https://proposal.here/samples/lattice-data-orchard-and-pine
markdown: https://proposal.here/samples/lattice-data-orchard-and-pine.md
vendor_type: "B2B software"
layout: "Sidebar"
cover: "Gradient cover"
currency: USD
publisher: "proposal.here"
---

*A sample from proposal.here. A software rollout with a shadow-mode pilot and the success criteria agreed on the call. Every company, person and number below is invented to show what a finished proposal reads like; the HTML page renders it in the sidebar layout and lets you switch layouts, covers and density. Real proposals are drafted from a discovery-call recording or transcript in the vendor's own brand.*

# See Thursday on Monday across all fourteen stores

Shelf-level demand forecasting with a shadow-mode pilot in three stores before anything changes

- **Prepared for:** Priya Natarajan, Orchard & Pine — Independent grocery, 14 stores
- **Prepared by:** Jonah Weiss, Lattice Data (jonah@latticedata.example)
- **Date:** September 30, 2026

**At a glance**

- **6.8% → 4.5%** fresh waste target by week 9
- **97%** top-50 SKU availability on Thursdays
- **< 1 hour** for the Monday ordering session

## Executive summary

Orchard & Pine re-orders by hand on Monday mornings using last week's sell-through. Fresh waste runs at 6.8% of revenue, the two best stores stock out of top SKUs by Thursday, and the merchandising team does not want a seventh person to manage spreadsheets.

Lattice replaces the Monday spreadsheet with a store-by-SKU forecast that updates nightly and writes suggested orders straight into your ordering system. Nothing changes in the stores until the forecast has proven itself in shadow mode.

The platform is licensed per store per month, with a one-time implementation fee. If two of the three pilot criteria are not met by week nine, you can stop before the roll-out and pay only for the pilot months.

## What we heard

### Monday mornings decide the week
Every store manager builds the order from last week's numbers and a feel for the weather. The process takes most of the morning.
> If I could see Thursday on Monday, I would not need the extra headcount.

### Waste and stock-outs at the same time
Fresh categories lose 6.8% of revenue to waste while the two busiest stores run out of top SKUs by Thursday afternoon.
> We are throwing away strawberries in Elm Street and running out of them in Harbor.

### Trust has to be earned first
Store managers have been burned by a previous tool that over-ordered. They need to see the forecast beside their own numbers before they act on it.

### Six people, not seven
The merchandising team is at capacity and the plan for next year does not include another analyst.

## Why Lattice fits

### Forecasts at the shelf, not the category
Every store and SKU gets its own nightly forecast from eighteen months of POS history, weather and local events.
_Elm Street and Harbor stop sharing one number_

### Shadow mode before anything changes
For three weeks the forecast runs next to the Monday process so managers see where it would have been right.
_Trust built on your data_

### Orders written, not exported
Suggested orders go straight into your ordering system for one-click approval; no spreadsheets, no re-keying.
_The Monday session shrinks to under an hour_

## Implementation plan

### Weeks 1–2 — Connect
POS and supplier feeds connected, eighteen months of history loaded, store calendars captured.

### Weeks 3–5 — Calibrate
Forecasts run in shadow mode next to the Monday process; weekly accuracy report to Priya.

### Weeks 6–9 — Pilot
Elm Street, Harbor and Ridge order from Lattice suggestions, with a weekly review against the success criteria.

### Weeks 10–12 — Roll out
Remaining eleven stores go live in two cohorts, with a two-hour training session per cohort.

## Success criteria and scope

We agreed on the call that the pilot is a success when, across the three pilot stores, at least two of the three criteria below are met by week nine.

### Pilot success criteria
- Fresh waste below 4.5% of revenue
- Top-50 SKU availability above 97% on Thursday and Friday
- Monday ordering session under one hour

### Included in the licence
- Nightly store-by-SKU forecasts and suggested orders
- Integration with your POS and ordering system
- Weekly accuracy report and a manager dashboard

### Support and training
- A named implementation lead for the first twelve weeks
- Two-hour training per store cohort
- Chat support with a one-business-hour response time

**Out of scope:** supplier negotiations, planogram changes and hardware.

## Investment

The platform is licensed per store per month and billed quarterly in advance once a store is live; pilot stores are billed only from the week they start ordering from Lattice. Implementation is a one-time fee covering integration, data load and pilot support.

- Stop before roll-out if two of three pilot criteria are not met: you pay only for the pilot months
- Annual pre-payment available at a 10% discount

| Item | Qty | Unit | Total |
| --- | ---: | ---: | ---: |
| **Platform licence** — Per store, includes nightly forecasts and suggested orders | 14 | $390 | $5,460 / month |
| **Implementation** — Integration, data load and pilot support | 1 | $12,000 | $12,000 one-time |

**Total: $17,460** ($5,460 / month · $12,000 one-time)

## Resources

- [Shadow-mode walkthrough](https://example.com/lattice/shadow-mode) — A six-minute recording of what store managers see during calibration.
- [Greenfield Market case study](https://example.com/lattice/greenfield) — Twelve stores, fresh waste from 7.1% to 3.9% in one quarter.
- [Security and data handling](https://example.com/lattice/security) — Where your data lives and who can see it.
- [Integration checklist](https://example.com/lattice/integrations) — What we need from your POS vendor before week one.

## Next steps

### Accept the proposal
Priya accepts here; Lattice returns the order form and data processing agreement within one business day.

### Introduce us to your POS vendor
A short email so we can request the feed access before kickoff.

### Pick the three pilot stores
We suggested Elm Street, Harbor and Ridge on the call; confirm or swap.

**Let's have Thursday visible on Monday before the holiday season.**

On a live proposal the Accept button at https://proposal.here/samples/lattice-data-orchard-and-pine records the acceptance, notifies the sender and, when a payment link is attached, takes the prospect to payment. This sample's button is inert.

---

Other samples:
- [Northbeam for Halden Logistics](https://proposal.here/samples/northbeam-halden-logistics.md): Outbound sales agency; classic layout
- [Morrow Studio for Kestrel Freight](https://proposal.here/samples/morrow-studio-kestrel-freight.md): Design studio; editorial layout
- [Harbor & Vale for Tidewater Robotics](https://proposal.here/samples/harbor-and-vale-tidewater-robotics.md): Fractional CFO practice; minimal layout

Canonical HTML: https://proposal.here/samples/lattice-data-orchard-and-pine · Product overview: https://proposal.here/index.md · Create a workspace: https://proposal.here/sign-up
