---
title: "Sample proposal: Harbor & Vale for Tidewater Robotics (Minimal layout)"
description: "A short, plain retainer proposal for a founder who reads on her phone between meetings. A fictional sample rendered live by proposal.here."
type: sample_proposal
fictional: true
url: https://proposal.here/samples/harbor-and-vale-tidewater-robotics
markdown: https://proposal.here/samples/harbor-and-vale-tidewater-robotics.md
vendor_type: "Fractional CFO practice"
layout: "Minimal"
cover: "Minimal cover"
currency: USD
publisher: "proposal.here"
---

*A sample from proposal.here. A short, plain retainer proposal for a founder who reads on her phone between meetings. Every company, person and number below is invented to show what a finished proposal reads like; the HTML page renders it in the minimal layout and lets you switch layouts, covers and density. Real proposals are drafted from a discovery-call recording or transcript in the vendor's own brand.*

# Fractional finance leadership through the Series B

One day a week on site, a board-ready monthly close, and the model and data room for the spring raise

- **Prepared for:** Lena Fischer, Tidewater Robotics — Autonomous dock robotics
- **Prepared by:** Ravi Menon, Harbor & Vale (ravi@harborvale.example)
- **Date:** October 21, 2026

**At a glance**

- **Day 8** monthly board pack delivered
- **6 weeks** to a Series B model and data room
- **1 day** a week on site in Boston

## Context

Tidewater closed its Series A in June and has fourteen months of runway at the current burn. Lena is running finance herself alongside product, the board has asked for a monthly reporting pack, and the Series B conversation starts in the spring.

The company does not need a full-time CFO yet. It needs someone who has taken a hardware company through this exact window, one day a week, with the model and data room ready before investors ask.

## What we heard

### Finance is a second job
Lena closes the books herself at the end of every month, usually at night.
> I know the numbers. I do not have time to present them.

### The board wants a pack, not a spreadsheet
Two directors have asked for a monthly reporting pack with unit economics per robot deployed.

### The Series B starts in spring
First investor conversations in April mean the model and data room need to exist by March.
> I do not want to build the model the week before the first meeting.

## Scope of engagement

### Monthly
- Close and board reporting pack by the eighth business day
- Cash and runway update with a rolling 13-week view
- Operating model with unit economics per robot, maintained with your ops lead

### Series B preparation
- Financial model, narrative and investor Q&A
- Data room build and maintenance through the round
- Term sheet review alongside your counsel

### Team
- Hiring plan and compensation bands for the first finance hire
- Interviews and reference calls if you want them

**Out of scope:** bookkeeping, tax filings and audit, which stay with your current accounting firm.

## How we work

### One day a week in Boston
Ravi is on site every Tuesday and on Slack the rest of the week.
_The person you met does the work_

### Quarterly review, thirty days' notice
We review the engagement every quarter and either side can end it with thirty days' notice.
_No lock-in_

## Terms

The retainer is billed monthly in advance. The Series B model and data room is a fixed fee, billed on delivery of the first full version. Expenses are passed through at cost and pre-approved above $500.

| Item | Qty | Unit | Total |
| --- | ---: | ---: | ---: |
| **Fractional CFO retainer** — One day a week on site plus remote availability | 1 | $7,500 | $7,500 / month |
| **Series B model and data room** — Delivered within six weeks of kickoff | 1 | $9,000 | $9,000 one-time |

**Total: $16,500** ($7,500 / month · $9,000 one-time)

## Next steps

### Accept
Lena accepts here; the engagement letter follows the same day.

### First Tuesday on site
We start with the September close and the board pack format.

**The board pack for October can be the first one you do not build yourself.**

On a live proposal the Accept button at https://proposal.here/samples/harbor-and-vale-tidewater-robotics records the acceptance, notifies the sender and, when a payment link is attached, takes the prospect to payment. This sample's button is inert.

---

Other samples:
- [Northbeam for Halden Logistics](https://proposal.here/samples/northbeam-halden-logistics.md): Outbound sales agency; classic layout
- [Lattice Data for Orchard & Pine](https://proposal.here/samples/lattice-data-orchard-and-pine.md): B2B software; sidebar layout
- [Morrow Studio for Kestrel Freight](https://proposal.here/samples/morrow-studio-kestrel-freight.md): Design studio; editorial layout

Canonical HTML: https://proposal.here/samples/harbor-and-vale-tidewater-robotics · Product overview: https://proposal.here/index.md · Create a workspace: https://proposal.here/sign-up
